Steps to Implement a Configuration Control Board CCB

The Change Control Board will review any proposed changes from the original baseline requirements that were agreed upon with the client. If any change is agreed upon by the committee, the change is communicated to the project team and the client, and the requirement is baselined with the change. The authority of the Change Control Board may vary from project to project (see e.g. Consensus-based decision making), but decisions reached by the Change Control Board are often accepted as final and binding. The evaluation reviews the description of the problem to determine whether it requires a software change.

configuration control boards

A structured and consistent process for CCB meetings and reviews can help streamline the workflow and reduce the risk of errors and inconsistencies. By following such a process, changes can be managed in a timely, transparent, and traceable manner. The CCB may, from time to time, establish technical working groups (TWG), as required, to oversee, review, and make recommendations to the board on specific technical aspects of the CM Program, or configuration items. TWGs provide the subject-matter expertise necessary to ensure that documents, the DM2, and other products under configuration control of the CCB are maintained in a responsible manner. TWGs, when tasked by the CCB, provide detailed and comprehensive technical review of proposed changes and recommendations to the CCB on action(s) to be taken that result from recommended changes. Traditional change control boards use these large documents as their main artifacts for review.

Business vs IT vs Digital Transformation: Strategy Across 3 Critical Domains

If you are new to user stories, we have a blog post describing the process for mapping user stories. As a public user, I want to know that my complaint was submitted so that I can complete the process and save the information for my records. Roadmaps need to be regularly updated and renegotiated as the project develops to make sure you are building the right product. Revising roadmaps on a quarterly basis can work well, but the exact timing depends on project needs.

These may be headquarters (HQ) level property managers or technical representatives. Keeping track of the state of the board and other system variables can be just as important as knowing what version of the FPGA was loaded at the time of a specific fault or failure. In other words, when a problem occurred did it have the latest group of hardware modifications? Change description, reason for change and who made the change, current revision of the design, date, time, etc. The dynamic comparison of the manipulated and controlled variables for this control solution and the default BSM1 control is reported in Figures 2 and 3 for a period of approximately 10 days corresponding to low temperature weather in the long term data.

Value creation in application outsourcing relationships: an international case study on ERP outsourcing

As a result of the CCB decision, implementing direction
is given, typically in the form of a CCB directive. Actions directed
by the CCB include both contractual actions and tasking orders for
Government activities, as applicable. In response to a CCB Directive,
the Government contracting office prepares and negotiates a contract
modification to authorize the contractor to proceed with implementation
of the approved class I ECP or major/critical deviation. The structural design configuration should be placed under technical configuration control to prevent the introduction of inadvertent changes.

configuration control boards

Functional architecture includes the design documentation shown in Table 11.1. Logbooks should be maintained with each prototype board and these logs should be kept up-to-date. Information in the logbooks should include detailed information when a problem is encountered.

Creating a Change Advisory Board

The CDCA may be a Government activity or a contractor,
and the authority may be transferred. Change management includes tracking and documenting all planned changes, including formal approval for substantial changes and documentation of the results of the completed change. A change control board is a group of people who consider changes for approval. Signals, configuration control boards which link both blocks, are measured output, y and manipulated input, u. The signal w represents exogenous inputs, such as disturbances, references, noises and inputs from uncertainties and the exogenous output, z, is the control objective. Many control performance specifications can be expressed as the H∞ norm of certain closed-loop transfer functions.

configuration control boards

A change request is a formal document that describes the proposed change, its rationale, its impact, its priority, and its dependencies. Supporting documents may include technical specifications, design drawings, test results, risk assessments, cost estimates, and customer feedback. Preparing these documents ahead of time ensures that the CCB has all the information it needs to evaluate the change request and make an informed decision.

Setting Goals, Objectives, and Guiding Principles of the CCB

That framework should consider all dimensions of the change, including service and technical components, business and customer alignment, and compliance and risk. The CAB must also look for conflicting requests—these cases in particular require CAB members to maintain holistic, business-outcomes views that don’t favor the particular team or individual seeking the change. One of the most difficult aspects of CCB meetings and reviews is effectively managing conflicts and expectations among the CCB members and other stakeholders. Conflicts can arise due to varying perspectives, interests, preferences, or priorities for change requests, and expectations can differ based on the scope, complexity, urgency, or feasibility of the change requests. To manage these conflicts and expectations adequately, it is important to establish clear ground rules and guidelines for the CCB meetings and reviews, such as roles, responsibilities, procedures, criteria, and deadlines.

The board should hold regular meetings to evaluate whether the observation is a genuine software issue and assign attributes, such as priority, as well as consider the relevance to safety that the problem may pose, using the risk management process. Regular means an interval comfortable for your business and development projects. It would not be unusual for the pace to increase as the software nears release. Software under intensive testing may need weekly or even daily evaluation meetings.

Configuration Identification Index and Document Versioning Guidelines

Our overall goal was reduce risk while allowing for faster updates to the DOJ’s civil rights portal. To do so, we wanted to make sure that the team has small, frequent deploys while ensuring proper quality checks. Before we deploy any updates to the site, code goes  through three human evaluations and at least three rounds of automated testing. DevOps is aimed at reducing the risks of system downtime and failures when you deploy new software and updates. Overall, a well-managed DevOps process will mean you have less downtime and higher availability of your systems because smaller deploys are less likely to cause problems. This also allows for seamless deployments and helps your team maintain less-disruptive schedules.

  • The results in terms of pollutant removal and energy consumption are reported in Table 2, where they are compared with the results obtained with the control default configuration of BSM1.
  • But what if those changes have the potential to impact other applications?
  • This is achieved by increasing the dissolved oxygen in Z2 and decreasing it in zone Z3 and zone Z4.
  • The functional architecture must be complete and traceable to software specifications.
  • In developing CM processes for Architectural Descriptions it is recommended that best practices be adopted such as those outlined in Electronic Industries Alliance (EIA) Standard EA-649.

The CCB’s primary task is to ensure that all modifications to the CMDB are authorised, tested, documented, and implemented in a controlled manner, which helps your CMDB continuously deliver value. Additionally, the CCB ensures that all changes are aligned with the organisation’s policies, procedures, and standards. Bugs and flaws are normal in every project, and sometimes they will make it through even the most rigorous review processes, the important part is having clear plans to deal with them when they arise. When critical bugs or flaws are found in production for the civil rights portal, a business owner or their designee will request a hotfix. Once the solution is identified, the hotfix will undergo PR review and QA simultaneously.

Quality and Systems Assurance Managers

CCB charters are normally approved through the government procuring
activity official administrative channels. All CCB members must
be present at each CCB meeting and should be familiar, from their
functional perspective, with the changes being considered. CCB members
are obligated to make their position(s) known to the chairperson;
and ultimately to approving the CCB directive/order (when required)
noting their agreement or disagreement with the decision. To approve
the CCB Directive (CCBD), a person must be the primary (or alternate)
CCB member designated by the CCB charter. The CDCA on the other hand, pertains to specifications or any
other type of document and is independent of the organization that
physically maintains and stores the document. The CDCA is the organization
that has the decision authority over the contents of the document,
reflecting proprietary or data rights to the information that the
document contains.